Moneycontrol PRO
HomeNewsIndiaPreparation of DPR begins for 865-km long Delhi-Varanasi high-speed rail corridor

Preparation of DPR begins for 865-km long Delhi-Varanasi high-speed rail corridor

After the Delhi-Varanasi HSR corridor will be ready a bullet train could reduce travel time to about four-and-a-half hours between Delhi and Varanasi

July 25, 2020 / 12:31 IST
Representative Image

The National High Speed Rail Corporation Limited (NHSRCL) has started working on a detailed project report (DPR) for the proposed Delhi-Varanasi high-speed rail (HSR) corridor following directions by the central government.

The 865 kilometers long Delhi-Noida-Agra-Lucknow-Varanasi rail corridor is one of the eight HSR passageways. The other seven corridors are Delhi-Jaipur-Udaipur-Ahmedabad (886-km), Varanasi-Howrah (760-km), Mumbai-Nashik-Nagpur (753-km), Mumbai-Pune-Hyderabad (711-km), Ahmedabad-Mumbai (508-km), Delhi-Chandigarh-Ludhiana-Jalandhar-Amritsar (459-km) and Chennai-Bangalore-Mysore (435-km).

The proposed rail corridor between Varanasi and Howrah is the latest addition to the government’s HSR corridor plan.

The corridors have been proposed to optimise high-speed rail connectivity between major cities and give an impetus to the industrial sector, said a report by The Economic Times.

Work has already begun on the Ahmedabad-Mumbai corridor, said the report. It will see bullet trains running at 320 km per hour, it said.

After the Delhi-Varanasi HSR corridor will be ready a bullet train could reduce travel time to about four-and-a-half hours between Delhi and Varanasi which is the parliamentary constituency of Prime Minister Narendra Modi, said the report.

The NHSRCL has been entrusted by the Ministry of Railways to prepare DPR for the seven new corridors, including Delhi-Varanasi, Varanasi-Howrah, Mumbai-Nagpur, Delhi-Ahmedabad, Chennai-Mysore, Delhi-Amritsar, and Mumbai-Hyderabad, said the report quoting Sushma Gaur, additional general manager (corporate communication) at NHSRCL.

Earlier in July, NHSRCL had invited bids related to data collection, preliminary designs and survey work for the preparation of the DPR of the Delhi-Varanasi HSR corridor, said the report.

Currently, the company is collecting relevant data for the preparation of interim DPR, Gaur was quoted as saying. The location of stations will be proposed after survey reports and consultation with the government, she told the publication.

Moneycontrol News
first published: Jul 25, 2020 12:31 pm

Discover the latest Business News, Sensex, and Nifty updates. Obtain Personal Finance insights, tax queries, and expert opinions on Moneycontrol or download the Moneycontrol App to stay updated!

Subscribe to Tech Newsletters

  • On Saturdays

    Find the best of Al News in one place, specially curated for you every weekend.

  • Daily-Weekdays

    Stay on top of the latest tech trends and biggest startup news.

Advisory Alert: It has come to our attention that certain individuals are representing themselves as affiliates of Moneycontrol and soliciting funds on the false promise of assured returns on their investments. We wish to reiterate that Moneycontrol does not solicit funds from investors and neither does it promise any assured returns. In case you are approached by anyone making such claims, please write to us at grievanceofficer@nw18.com or call on 02268882347